Puckapunyal Military Base

We were engaged by Barpa Constructions late in 2015 to design, fabricate and install over 100sqm of premium inter-connected heavy duty shade cloth. We attached the sails around 5.5m above the existing timber decking and pulled down to large 200NB steel columns we installed which sat 2.7m above the...

We were engaged by Barpa Constructions late in 2015 to design, fabricate and install over 100sqm of premium inter-connected heavy duty shade cloth. We attached the sails around 5.5m above the existing timber decking and pulled down to large 200NB steel columns we installed which sat 2.7m above the existing and restored timber decking.
The project was completed with the 8 weeks period and the builder and the client (Australian Military) are very pleased with the project outcome.

Read more

PRODUCT

Shade cloth

PROGRAM

8 weeks